Featured Project

A conforming tender for a contiguous pile perimeter wall was priced at $900,000.Instant Screw Piling believed that this solution was in excess of the requirements for a building of the size intended for the site.

A solution comprising a combination of screw piles and a sheet pile perimeter wall sprayed with shotcrete provided a more economical solution.

Click here to read the full case study.

Environment

Instant Screw Piles are the pure environmental choice for deep foundations. Screw Pile rigs can reach out up to 20m, thereby not damaging vegetation adjacent to waterways. There is no environmental pollution from noise vibration, no soil spoil and no concrete wastage. Screw piles can be installed with minimal impact to the environment and damage to vegetation from the establishment of the screw piling installation rig. Because screw piles are generally purpose built for the application wastage is virtually eliminated. Screw piles can be used effectively in footbridges, road bridges and a range of other environmental projects where the installation rates are very fast and exceed those rates of traditional piling methods. This means that the construction process time is reduced thereby lowing the impact on the vegetation and the environment.