Featured Project

To stabilise the retaining wall tonnes of rail ballast were placed against the base of the embankment, to prevent further movement, and half of the road above it was blocking off.

Instant Screw Piling devised a procedure for cutting holes in the existing shotcrete wall, installing screw piles, tensioning them, and trying them in to the (repaired) shotcrete wall.

Click here to read the full case study.